Question
Closed · Answered

How should I record a request that has been split into several smaller requests?

Hovhannes Vktarget

A single request may turn out to involve several pieces of work that need separate tracking. In Busabase, how should I connect the new records to the original request? Should the original remain open as an overview, or be marked as split so it is not counted as another unfinished item?

Report
Kelly
Team
· edited

When one request turns into several pieces of work, keep the original as the parent overview and create child requests for each trackable piece. Mark the parent so it is not counted as a second unfinished item in the same queue as the children.

*Diagram · parent Split + child workstreams*

Recommended shape

RecordRole
Parent requestOriginal ask, context, overall success criteria; status like Split / Parent
Child requestsEach concrete workstream; Relation → parent; own owner, due date, status

Optional: a splitFrom link on children and a short note on the parent listing why it was split.

Status rules (important for counts)

  1. When you split: set parent to Split (or Parent — tracking only), not Open/In progress if those statuses feed “unfinished” dashboards.
  2. Children carry the real workflow (Open → In progress → Done).
  3. Close the parent only when all children are done (or cancelled)—or keep parent Split and use a rollup/checklist of children.
  4. Views for “my open work” should exclude parent/Split rows (filter status ≠ Split, or type = Child).

How to verify

  • Open-work count equals the children, not parent + children.
  • Opening the parent lists every child.
  • Opening a child shows the original context via the parent link.
  • Cancelling one child does not silently close the others.

Boundaries

  • If the “pieces” are only checklist steps for one owner, a checklist on the same request may be enough—no need to split.
  • Split when owners, due dates, or acceptance criteria diverge.
  • Do not leave the parent Open “for visibility” while children are also Open—that double-counts.

If you say whether unfinished work is counted by status or by a checkbox, we can suggest the exact filter for your view.

Report

Your reply

Sign in to join the discussion. Reading is always open; you only need an account to post.

Sign in